Thursday, September 16, 2010

week 2



Wow, after a good start last week we have continued the momentum and the GP is progressing beautifully. With the help of our friends from Fern Creek in Louisville and some Gathering peeps here we have been able to accomplish a lot this week. So far we have three bathrooms tiled (the fourth may be done before Friday), ceiling grid wire hanging from the ceiling, a slab was poured this morning that will hold the HVAC units outside, outlets and emergency exit lighting were installed and the fire suppression sprinklers were completed in phase 2 and 3. It is amazing to see how much work is being done each day and we thank our God and King for everything that he is providing daily to complete this project. We have been blessed with tremendous people who have come to serve, others who have donated materials and others who have sacrificially given. We praise you Father for what you are doing.
Below is an updated list of the materials still needed for the completion of the building. As we have been asking we have found that some people have a lot of these things lying around in their warehouse or garage not being used. If you have a minute we appreciate you looking around.

Project 52 Materials Needed

HVAC

-5 ton split package system-3 phase (either 208 or 480)
-ductwork

-copper line sets

-wire

-refrigerant

-disconnects

Ceilings

-$3,000 to buy dropped ceiling material

Entry Door

-$2,500 to buy roll-up door

Interior Doors

-$5,000 includes handles, frames, hinges, and closers

Flooring

Epoxy

Cove base

Cove base glue

Fire Alarm

Wire

Panel

strobes